咨询电话:010-62091158

工程展示

咨询热线

国家体育场

发布时间:2014-09-03 14:59:00 点击:

国家体育场


工程建设
奥运体育馆为2008年安慧主场馆, 由于新增设备管道和通风管道,需要在楼板及墙体增开洞口,并且对部分洞口进行粘钢加固。
施工内容
水钻排孔拆除、锯机切割、站岗加固以及植筋工程等。
The national stadium
Engineering construction
Olympic stadium  for the 2008 sthiramati stadium, pipeline and ventilation pipe, due to the new equipment need to open the mouth of the cave floor and wall body, and part of the mouth of the cave for steel reinforcement.
The construction content
Diamond hole demolition, saw cutting, standing guard reinforcement and steel engineering, etc.